From: route@monster.com
Sent: Monday, April 25, 2016 1:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Data Entry QA
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Larry W. Ciak 11833 South Aztec Road, Draper, Utah 84020 Cell 801 520-1482 Home: 801-553-2216 Larry.Ciak@comcast.net Resume
of: Larry W. Ciak Career Statement: As a fully experienced Electrical
Engineer with many years of varied experience, there’s much I can offer to a
company that desires these attributes. I have more than 25 years of
experience in construction, maintenance, and contract and project management.
I’m confident that my passion for the industry together with my skills and
experience will enable me to make a significant difference at your company. Skills and Tools:
EMPLOYMENT HISTORY Matrix Service
Company
Sept 13, 2013 – Jan. 21, 2014 Electrical Engineer Electrical QA/QC Engineer (TransCanada
Keystone XL Pipeline – Cushing OK.) ·
Verified compliance with Inspection and Test Plans(ITP) for electrical
systems. Voltages and equipment ranged from 480 VAC to 13.8 VAC.The ITPs were
for all equipment, switchgear, transformers, distribution panels as well as
the cabling and cable tray installation. ·
Performed, verified and approved QA/QC inspections of electrical
contractor’s installations. ·
Oversaw, witnessed and verified all required electrical testing. ·
Developed and maintained commissioning packages for project turnover
to Client. ·
Maintained and tracked electrical contractor’s progress. ·
Performed site Safety Walk downs to ensure compliance with site and
OSHA safety rules and regulations. ·
Reviewed blue prints for accuracy and constructability. Matrix Service
Company
January 9, 2013 – April 7, 2013 Electrical Engineer Electrical QA/QC Engineer (Kennecott
Utah Copper) ·
Developed Inspection and Test Plans for electrical systems. Voltages
and equipment ranged from 480 VAC to 13.8 VAC.The ITPs were for all
equipment, switchgear, transformers, distribution panels as well as the
cabling. ·
Performed, verified and approved QA/QC control of electrical
contractor’s installations. ·
Developed and maintained commissioning packages for project turnover
to Client. ·
Maintained and tracked electrical contractor’s progress. ·
Audited contractor’s time sheets for accuracy and per-cent completion. ·
Performed site Safety Walk downs to ensure compliance with site, MSHA
and OSHA safety rules and regulations. ·
Reviewed blue prints for accuracy and constructability. ·
Participated in daily and weekly Client and contractors meetings. K’nowbe Works
LLC
July 16, 2012 – September 16, 2012 Electrical Design Engineer ·
Design electrical distribution systems for waste water and
recirculation systems used in the Gas and Oil industry. ·
Used AutoCAD Electrical 2013 as design CAD program. ·
Participated in team evaluation and specifications of electrical
equipment for the manufacture and fabrication of portable trailer units. ·
Completed design drawings for a completed project in Canada and one
for a confidential client. EG&G (URS) Corp. Stockton,
Utah
August 8 2005 – June 26, 2012 Tooele Chemical
Demilitarization Facility Electrical Maintenance
Engineer ·
Perform a combination of duties necessary to provide Engineering
support during plant operations as required to maintain TOCDF within local
and federal regulations and designed operation and configuration parameters.
Duties include reviewing technical data packages for plant equipment
configurations and identifying potential areas for design improvements;
reviewing problems identified by Quality Control personnel and recommending
corrective actions; evaluating performance of plant equipment to include
periodic entry into the chemical exclusion area and processes to ensure
equipment is operated safely and efficiently; and interpreting
specifications, technical project requirements, and literature in support of
operation and maintenance activities. Duties in this area are focused on
conventional engineering application specifically applicable to plant
maintenance; however, I also performed general duties in support of the
overall engineering processes as required. ·
The plant is in a closure status. My additional duties include writing
a complete Decommissioning Work Package (DWP) for seven assigned systems. Maverick Technologies,
Columbia,
IL
February 2, 2004 – January 28, 2005 Owner’s Representative:
Contract Position ·
Resident Construction Engineer (Electrical) for Anheuser-Busch in
Fairfield, California. ·
Conducted pre and post bid meetings. ·
Recommended contract award. ·
Ensured compliance with all contract documents, codes and
specifications. ·
Maintained a three-week look-ahead schedule. ·
Coordinated all Operations disruptions with all department heads
affected. ·
Reviewed prints for constructability and cost – return benefit. ·
Monitored compliance with OSHA. ·
Wrote scopes of work and specifications. ·
Chaired weekly progress meetings with all contractors. ·
Verified calibration of process instrumentation. ·
Coordinated and interfaced with all levels of management. Maverick Technologies,
Columbia,
IL
February 5, 2003 – January 17, 2004 Owner’s Representative:
Contract Position ·
Resident Construction Engineer (Electrical) for Anheuser-Busch in
Idaho Falls, Idaho. ·
Conducted pre and post bid meetings. ·
Ensured compliance with all contract documents, codes and
specifications. ·
Tracked contractor progress in accordance with master construction
schedule. ·
Maintained a three-week look-ahead schedule. ·
Verified contractor progress for correct payment application. ·
Reviewed prints for constructability and cost – return benefit. ·
Monitored compliance with OSHA. ·
Wrote scopes of work and specifications. ·
Chaired weekly progress meetings with all contractors. IBEW, Pocatello, ID
August 2002- December
2002
Lead Electrical Technician:
Idaho National Environmental Engineering Laboratory, Arco, Idaho. (Contract
Position) ·
Terminated and verified instrumentation. ·
Verified correct cable routing and labeling. ·
Hi-potted and meggered high voltage cables. Fresenius Medical Corporation,
Ogden,
Utah
September 2001 – August 2002 Sterilization Validation
Engineer: (Contract Position) ·
Designed and installed new controls for an 800-liter sterilizer. ·
Reconfigured PLC program and HMI screens for this sterilizer. ·
Validated sterilization cycles and software. ·
Ensured compliance with cGMP and 21 CFR. ·
Performed power and harmonic studies. ·
Performed routine maintenance and repairing of sterilizers when
required. ·
Maintained PLC software. ·
Assisted Calibration Department. ·
Performed checks on process piping. ·
Ensured all SOPs were in compliance with protocols submitted to FDA. Utah Kennecott Copper, Magna,
Utah
October 2000 – September 2001 Senior Electrical Technician ·
Maintained all PLC controls, motor and sequences controls of surface
mining operation. ·
Diagnosed and repaired DC stripping shovels and blast drills including
their associated PLC control systems. ·
Maintained and repaired seven miles of conveyor belt including the
transfer stations and their controls. ·
Analyzed and designed a reactive power filter circuit for all shovels. ·
Maintained all high voltage sub-stations and cable. ·
Repaired high voltage cables. ·
Performed all electrical maintenance on motors up to 800 horsepower. Wasatch Electric, Salt Lake
City, Utah
July 1997 – September 2000 Project Electrical Engineer
and Foreman EDUCATION and Skills: Bachelor of Science,
Electronics/Electrical Engineering, Weber State University. Completed 15 hours towards a
Masters In Engineering: California National Institute for Advanced Studies. Certifications: Master
Electrician, Utah. LOTO Training Safety Training First Aid and CPR Certified
(National Safety Council) Software: AutoCad: Autocad Electrical,
Autocad MEP-Revit, AutoCad PI & D Microsoft: Office Suite SAP (Anheuser-Busch Corporation) MAXIMO CMMS Awarded the United States Army
Commendation Medal |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|